Commissioning · 2025Data Center — Cheyenne, WY
Level 3–5 commissioning of LV/MV distribution, UPS and battery systems, generator paralleling, and BAS interface verification.
Project Portfolio
Since 2023: hyperscale data centers for Microsoft and AWS, a tier-one HVDC substation, utilities, universities, and industrial plants — across ten U.S. states.
Commissioning · 2025Level 3–5 commissioning of LV/MV distribution, UPS and battery systems, generator paralleling, and BAS interface verification.
Testing & Commissioning · 2025Round-the-clock testing on a tier-one HVDC substation: energization sequences and acceptance testing on Hitachi HVDC inverter/rectifier equipment to ANSI/NETA ATS.
E&I · 2023Full inspection and troubleshooting of the facility's instrumentation system to isolate failed and obsolete components, followed by procurement, installation, and commissioning of replacement instrumentation and control devices.
NETA Acceptance · 2025NETA acceptance testing across the LV/MV power distribution system — switchgear, transformers, protective relays, and breakers — verified for safe energization ahead of campus turnover.
Commissioning · 2025Level 3–5 commissioning of LV/MV distribution, UPS and battery systems, generator paralleling, and BAS interface verification, with IST scripting and execution.
Installation & Maintenance · 2024Installation and testing of MV switchgear relays for an existing data center build-out, followed by ongoing preventive maintenance testing to keep systems within NETA MTS tolerances.
NETA Acceptance · 2024NETA acceptance testing of incoming MV switchgear, step-down transformers, and breaker protection schemes ahead of first energization for a new data center campus.
NETA Acceptance · 2023NETA acceptance testing on LV/MV distribution equipment — insulation resistance, contact resistance, and protective relay verification — prior to energizing a new data center facility.
A sample of the work — these are a few highlights from 20+ engagements delivered since 2023.
Nationwide coverage
Projects delivered across 10 states — OR · WA · CA · TX · IA · WY · VA · AZ · ME · GA — with crews mobilized anywhere in the U.S.
NETA acceptance and maintenance testing, full commissioning, and engineering studies across hyperscale, utility, and industrial campuses. Project references with full client contacts are available on request, subject to existing NDAs.